
Exterior views - as complete










The vestibule floor was protected and then cleaned and repaired by the stone / tile specialist.
The vestibule to hall stained glass door and doorway were taken down and rebuilt, at the transition from the old vestibule floor to the new marble floor.
All the facings were repaired or replaced to match and the hall was lined with a new dado panel.
The flashings to the doorway gablet were repaired and replaced and the leak damaged timbers replaced or treated insitu.