Exterior survey
Front / east elevation before phase 2
The stone mason and the pointing contractor had their work cut out
Rear / west elevation during Phase 1, before Phase 2
Broken lintel at dining room
FF bathroom window and valley
The infamous pink pointing on the north gable
Interior
Above: The drawing room, as was, with soggy wallpaper, steel radiators and painted marble fireplace
Above: All the original bathroom and wc plumbing was directed into a single 3" lead pipe, buried under the new extension…
Above: This is the original bedroom which became Bedroom 2 and the shower room.
Above: Master bedroom stripped, with steel roof and floor support above.
Below: The same bedroom on the other side
Below: The same bedroom on the other side
Left and above: A couple of instances of the first floor repair works in progress
Above: This is the original FF bathroom
Below: The boxroom next to the Master bedroom during roof repairs.