Exterior survey

Stacks Image 20
Front / east elevation before phase 2
Stacks Image 28
Stacks Image 34
The stone mason and the pointing contractor had their work cut out
Stacks Image 22
Rear / west elevation during Phase 1, before Phase 2
Stacks Image 30
Stacks Image 41
Stacks Image 24
Broken lintel at dining room
Stacks Image 32
FF bathroom window and valley
Stacks Image 57
The infamous pink pointing on the north gable

Interior

Stacks Image 51
Above: The drawing room, as was, with soggy wallpaper, steel radiators and painted marble fireplace
Stacks Image 63
Above: All the original bathroom and wc plumbing was directed into a single 3" lead pipe, buried under the new extension…
Stacks Image 65
Stacks Image 53
Above: This is the original bedroom which became Bedroom 2 and the shower room.
Stacks Image 59
Above: Master bedroom stripped, with steel roof and floor support above.

Below: The same bedroom on the other side
Stacks Image 61
Stacks Image 69
Left and above: A couple of instances of the first floor repair works in progress
Stacks Image 55
Above: This is the original FF bathroom
Below: The boxroom next to the Master bedroom during roof repairs.
Stacks Image 67