Exterior survey

Front / east elevation before phase 2

The stone mason and the pointing contractor had their work cut out

Rear / west elevation during Phase 1, before Phase 2


Broken lintel at dining room
FF bathroom window and valley

The infamous pink pointing on the north gable
Interior
Above: The drawing room, as was, with soggy wallpaper, steel radiators and painted marble fireplace

Above: All the original bathroom and wc plumbing was directed into a single 3" lead pipe, buried under the new extension…


Above: This is the original bedroom which became Bedroom 2 and the shower room.

Above: Master bedroom stripped, with steel roof and floor support above.
Below: The same bedroom on the other side
Below: The same bedroom on the other side


Left and above: A couple of instances of the first floor repair works in progress

Above: This is the original FF bathroom
Below: The boxroom next to the Master bedroom during roof repairs.
