s.w.elev near complete a

The roof has been repaired, rainwater system renewed, including a new cast iron hopper, the old aluminium shop door has been taken away and replaced with an indented matching stone, with full width window. The stones around the entrance have been repaired, including a new door step and the entrance doors are newly made to match the building. The new windows are intended to match the originals while accommodating insulated glazing units and the trefoil ventilators have been reinstated with a black backing.

© Fiona Rodger 2018